EPISODE · Jun 29, 2026 · 11 MIN
Kenner wants more pumping, drainage capacity. Here's what to know
from WWL First News with Tommy Tucker
Heavy rains from Arthur overwhelmed Kenner’s pumping and drainage system. We talk with Mayor Michael Glaser about what happened and the need to increase capacity.
Embed this episode
NOW PLAYING
Kenner wants more pumping, drainage capacity. Here's what to know
0:00
11:57
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of WWL First News with Tommy Tucker?
This episode is 11 minutes long.
When was this WWL First News with Tommy Tucker episode published?
This episode was published on June 29, 2026.
Can I download this WWL First News with Tommy Tucker episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!