Key Bridge Rebuild: Almost two years after the disaster, an update episode artwork

EPISODE · Jan 14, 2026 · 23 MIN

Key Bridge Rebuild: Almost two years after the disaster, an update

from Midday · host WYPR 88.1 FM Baltimore

Bruce Gartner, executive director of the Maryland Transportation Authority, joins us to discuss progress in replacing Baltimore's Francis Scott Key Bridge, destroyed by a ship collision in March 2024.

Episode metadata supplied by the publisher feed · Published Jan 14, 2026

Embed this episode

NOW PLAYING

Key Bridge Rebuild: Almost two years after the disaster, an update

0:00 23:59

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Midday?

This episode is 23 minutes long.

When was this Midday episode published?

This episode was published on January 14, 2026.

Can I download this Midday episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!