Keys to Rapid Installation
Episode 84 of the WoodSolutions Timber Talks podcast, hosted by Adam Jones, titled "Keys to Rapid Installation" was published on April 25, 2022 and runs 21 minutes.
April 25, 2022 ·21m · WoodSolutions Timber Talks
Episode Description
Prefabricated timber buildings can be much faster than traditional construction, only if the rate of installation is optimised for. Unfortunately, sometimes the installation is an afterthought, and the original promises of significant program savings can quickly fade away. Here, the installers perspective is critical to enable fast construction. In this episode we're speaking with Chris Wood the General Manager of StandStruct about:
- The benefits of engaging an installer early on in projects
- The importance of co-ordinating between timber non-timber interfaces,
- And strategies for enabling program savings in installation
If you want to learn more about designing or building with timber, I recommend you go to the WoodSolutions Website and download the Technical Design Guides:
https://www.woodsolutions.com.au/publications
I recommend watching the WoodSolutions weekly webinars. Previous recordings can be found on the WoodSolutions website:
Similar Episodes
No similar episodes found.