Skip to content
Keys to Rapid Installation episode artwork

EPISODE · Apr 25, 2022 · 21 MIN

Keys to Rapid Installation

from WoodSolutions Timber Talks

Prefabricated timber buildings can be much faster than traditional construction, only if the rate of installation is optimised for. Unfortunately, sometimes the installation is an afterthought, and the original promises of significant program savings can quickly fade away. Here, the installers perspective is critical to enable fast construction. In this episode we're speaking with Chris Wood the General Manager of StandStruct about: The benefits of engaging an installer early on in projects The importance of co-ordinating between timber non-timber interfaces, And strategies for enabling program savings in installation If you want to learn more about designing or building with timber, I recommend you go to the WoodSolutions Website and download the Technical Design Guides: https://www.woodsolutions.com.au/publications I recommend watching the WoodSolutions weekly webinars. Previous recordings can be found on the WoodSolutions website: https://woodsolutions.com.au/

Episode metadata supplied by the publisher feed · Published Apr 25, 2022

Embed this episode

Ready to play

Keys to Rapid Installation

0:00 21:28

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of WoodSolutions Timber Talks?

This episode is 21 minutes long.

When was this WoodSolutions Timber Talks episode published?

This episode was published on April 25, 2022.

Can I download this WoodSolutions Timber Talks episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!