Kingfisher Expands Bulk Tonnage Gold System within the HWY 37 Project episode artwork

EPISODE · Nov 11, 2025 · 15 MIN

Kingfisher Expands Bulk Tonnage Gold System within the HWY 37 Project

from Mining Stock Daily · host Trevor Hall

Dustin Perry of Kingfisher Metals discusses the latest drill results from the  Upper Hank epithermal system. The drill hole cut 110.0 m1 of 0.47 g/t Au. This hole collared approximately 500 m to the southeast of the historical non-43-101 compliant mineral resource within the Pit area. This drill hole demonstrates high potential for lateral and vertical expansion of a near surface bulk tonnage disseminated gold system. A 500 m gap in drilling to northwest at Pit deposit, 600 m gap in drilling to west, two shallow intercepts to south, and untested eastern domains points to significant growth potential.

Episode metadata supplied by the publisher feed · Published Nov 11, 2025

Embed this episode

NOW PLAYING

Kingfisher Expands Bulk Tonnage Gold System within the HWY 37 Project

0:00 15:55

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Mining Stock Daily?

This episode is 15 minutes long.

When was this Mining Stock Daily episode published?

This episode was published on November 11, 2025.

Can I download this Mining Stock Daily episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!