Skip to content
Kings Hill MAX Station episode artwork

Dec 20, 2018 10 min

Kings Hill MAX Station

from The John Erickson Channel

TriMet is considering cutting several downtown Portland MAX stops in order to expedite the trains. But neighbors of one of the targeted stations say losing their stop will be heavily disadvantageous to people with disabilities, and would ignore the coming growth in their neighborhood. We hear comments at a TriMet board meeting from Connie Kirk, Sherry Solomon, and Mark Velke.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Kings Hill MAX Station

0:00 10:00

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The John Erickson Channel?

This episode is 10 minutes long.

When was this The John Erickson Channel episode published?

This episode was published on December 20, 2018.

Can I download this The John Erickson Channel episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.