Kitchenloo's ION - A CHARGED LRT: Ep. 128 episode artwork

EPISODE · May 27, 2026 · 1H

Kitchenloo's ION - A CHARGED LRT: Ep. 128

from The Red Line Podcast

Today on the show, we're talking about the Waterloo region’s remarkable LRT system: the ION. Just how did such a small city get a light rail transit system, and where might it go next? All this, after The News. Links and stuffs Merch:https://shop.trlpod.com/ Twitter:@TheRedLine_pod YouTube channel:The Red Line Podcast Spotify:The Red Line Podcast Patreon:https://www.patreon.com/theredlinepodcasters Email:[email protected] Website:https://www.trlpod.com/ Timestamps References & notes [1]Mass Transit: UTA's Midvalley Express BRT begins passenger service [2]KSL News Utah: Proposed Data Center in Box Elder County [3]@AnalytiKroll: Video of the driver flooring it into the wall. [4]Wikipedia: Ion rapid transit [5]Grand River Transit: Performance measures [6]CTV News: Timeline: Looking back at a 17-year journey to ION [7]Green Municipal Fund: Case study: Region of Waterloo, ON, develops LRT to connect its urban centres [8]Region of Waterloo: Stage 2 ION [9]Region of Waterloo: The ION Story

Episode metadata supplied by the publisher feed · Published May 27, 2026

Embed this episode

Ready to play

Kitchenloo's ION - A CHARGED LRT: Ep. 128

0:00 1:00:57

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Red Line Podcast?

This episode is 1 hour and 0 minutes long.

When was this The Red Line Podcast episode published?

This episode was published on May 27, 2026.

Can I download this The Red Line Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!