Kumasi to Experience More Power Outages After World Cup as ECG And GRIDCo Prepare Critical Transmission Projects episode artwork

EPISODE · Apr 28, 2026 · 18 MIN

Kumasi to Experience More Power Outages After World Cup as ECG And GRIDCo Prepare Critical Transmission Projects

from Adom Kasiebo

Parts of the Ashanti Region are expected to experience more power outages as the Electricity Company of Ghana (ECG) and the Ghana Grid Company (GRIDCo) prepare to commence critical transmission reinforcement projects in June this year

NOW PLAYING

Kumasi to Experience More Power Outages After World Cup as ECG And GRIDCo Prepare Critical Transmission Projects

0:00 18:17

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of Adom Kasiebo?

This episode is 18 minutes long.

When was this Adom Kasiebo episode published?

This episode was published on April 28, 2026.

What is this episode about?

Parts of the Ashanti Region are expected to experience more power outages as the Electricity Company of Ghana (ECG) and the Ghana Grid Company (GRIDCo) prepare to commence critical transmission reinforcement projects in June this year

Can I download this Adom Kasiebo episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!