EPISODE · Apr 28, 2026 · 18 MIN
Kumasi to Experience More Power Outages After World Cup as ECG And GRIDCo Prepare Critical Transmission Projects
from Adom Kasiebo
Parts of the Ashanti Region are expected to experience more power outages as the Electricity Company of Ghana (ECG) and the Ghana Grid Company (GRIDCo) prepare to commence critical transmission reinforcement projects in June this year
Embed this episode
NOW PLAYING
Kumasi to Experience More Power Outages After World Cup as ECG And GRIDCo Prepare Critical Transmission Projects
0:00
18:17
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Kasiebo is Naket
Multimedia Ghana
Adom FM Evening news bulletin.
Yen Di Dwa
Multimedia Ghana
Adom Fm Yen Di Dwa
Adom Kaseɛ
Multimedia Ghana
Prime-Time News that gives details of news and current occurrences in Ghana and beyond. It covers socio-political affairs, commerce, academia, sports and entertainment: both local and international.
Kasiebo is Tasty
Multimedia Ghana
Adom FM midday news
Frequently Asked Questions
How long is this episode of Adom Kasiebo?
This episode is 18 minutes long.
When was this Adom Kasiebo episode published?
This episode was published on April 28, 2026.
Can I download this Adom Kasiebo episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!