La adjudicación de la obra de tratamiento de aguas del Roque no se puede parar episode artwork

EPISODE · Oct 22, 2015 · 2 MIN

La adjudicación de la obra de tratamiento de aguas del Roque no se puede parar

from Podcast PP de La Palma

Cabrera urge al Cabildo a que contrate la obra de tratamiento y traslado de aguas del Roque de los Muchachos

Episode metadata supplied by the publisher feed · Published Oct 22, 2015

Embed this episode

NOW PLAYING

La adjudicación de la obra de tratamiento de aguas del Roque no se puede parar

0:00 2:25

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Podcast PP de La Palma?

This episode is 2 minutes long.

When was this Podcast PP de La Palma episode published?

This episode was published on October 22, 2015.

Can I download this Podcast PP de La Palma episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!