EPISODE · Mar 19, 2022 · 8 MIN
Larry Long Leads American Roots Review Into The Dakota Friday Night April 8, 2022
from Jazz88 · host American Roots Revue by Raquel Mendez
The American Roots Revue grew from a project done by Larry Long and J.D. Steele under the auspices of the Southern Poverty Law Center to honor the diversity of American music. They brought in the likes of Robert Robinson and Tania Hughes Kendrick and her son Cameron. The Revue is staged Friday April 8 at the Dakota in Minneapolis, at 7 and 9:30. Larry Long talks about the show. But first, Robert Robinson sings.
Embed this episode
NOW PLAYING
Larry Long Leads American Roots Review Into The Dakota Friday Night April 8, 2022
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.