Lay of the Land: Challenges to Data Center Construction—Past, Present, and Future episode artwork

EPISODE · Apr 9, 2025 · 41 MIN

Lay of the Land: Challenges to Data Center Construction—Past, Present, and Future

from HUB Talks

In this episode of Lay of the Land, K&L Gates Real Estate lawyer David Rubenstein is joined by Paul Manzer, principal and data center market leader with Navix Engineering, to explore the evolving landscape of data center construction. We dive into the unique civil engineering challenges—from site selection to due diligence—and trace the evolution of these challenges from past limitations to present-day complexities like supply chain issues and legal hurdles.  Looking ahead, we discuss future trends driven by AI and emerging technologies, examining how legal strategies and engineering innovation can address these challenges. We provide key takeaways for developers and investors, emphasizing the critical collaboration between legal and engineering teams.

Episode metadata supplied by the publisher feed · Published Apr 9, 2025

Embed this episode

Ready to play

Lay of the Land: Challenges to Data Center Construction—Past, Present, and Future

0:00 41:56

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of HUB Talks?

This episode is 41 minutes long.

When was this HUB Talks episode published?

This episode was published on April 9, 2025.

Can I download this HUB Talks episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!