Lee Drive Gets Temporary Fix | Baton Rouge News episode artwork

EPISODE · Aug 17, 2026 · 1 MIN

Lee Drive Gets Temporary Fix | Baton Rouge News

from Baton Rouge News Today | 2 Min News | The Daily News Now!

Baton Rouge is rolling out a temporary asphalt overlay on Lee Drive between Perkins Road and Highland Road to tackle potholes ahead of the big MOVEBR road widening project—set for late September. This quick fix, described as a “pit stop,” aims to ease daily commutes while the major expansion continues. Mayor Sid Edwards confirmed residents’ frustration with the rough road conditions and emphasized this patch-up is about immediate relief—not a permanent solution—keeping drivers safer and smoother until the full project kicks in. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/abd4eb89c702d025

Episode metadata supplied by the publisher feed · Published Aug 17, 2026

Embed this episode

NOW PLAYING

Lee Drive Gets Temporary Fix | Baton Rouge News

0:00 1:29

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Baton Rouge News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Baton Rouge News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on August 17, 2026.

Can I download this Baton Rouge News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!