Lemoyne Bottleneck Fixes Begin | Harrisburg News episode artwork

EPISODE · Aug 24, 2026 · 1 MIN

Lemoyne Bottleneck Fixes Begin | Harrisburg News

from Harrisburg News Today | 2 Min News | The Daily News Now!

PennDOT’s tackling the Lemoyne Bottleneck with subsurface utility work this week on Market and Front Streets—expect lane delays until Aug 29. This stretch, plagued by crashes (79 since 2012, including one fatal), features dangerous curves, poor visibility, and crumbling sidewalks. The long-term fix—road reconfigurations, wider lanes, new sidewalks, and upgraded signals—is still in design phase, with construction slated for 2027. Stay alert in work zones and check 511PA for real-time updates. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/c6067000798425be

Episode metadata supplied by the publisher feed · Published Aug 24, 2026

Embed this episode

Ready to play

Lemoyne Bottleneck Fixes Begin | Harrisburg News

0:00 1:39

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Harrisburg News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Harrisburg News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on August 24, 2026.

Can I download this Harrisburg News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!