EPISODE · Oct 16, 2023 · 38 MIN
Let’s Ask Paul | Episode 151 | MC Supports, Digital Electricity, MC and Heavy Timber
from Ask Paul | National Electrical Code · host Paul W. Abernathy
Listen as Paul Abernathy, CEO, and Founder of Electrical Code Academy, Inc., the leading electrical educator in the country, as he answers more questions from the Let’s Ask Paul Portal over at www.PaulAbernathy.com.In this episode, Paul will tackle the questions submitted by a listener. The topic covered in this episode is about supporting MC Cable in a wall after the building is finished, also a great discussion on digital electricity, where I quoted the wrong standards for Class 4 Fault Managed Systems and Associated cables which are UL 1400-1 and 1400-2 and installing MC Cable in a heavy timber application. I also address a question in the end about locknuts and bushings when doing pull box calculations.If you are looking to learn more about the National Electrical Code, for electrical exam preparation, or to better your knowledge of the NEC then visit https://fasttraxsystem.com for all the electrical code training you will ever need by the leading electrical educator in the country with the best NEC learning program on the planet.Become a supporter of this podcast: https://www.spreaker.com/podcast/ask-paul-national-electrical-code--4971115/support.
NOW PLAYING
Let’s Ask Paul | Episode 151 | MC Supports, Digital Electricity, MC and Heavy Timber
No transcript for this episode yet
Similar Episodes
Mar 31, 2026 ·54m
Mar 27, 2026 ·14m
Mar 24, 2026 ·42m
Mar 20, 2026 ·42m
Mar 17, 2026 ·41m
Mar 13, 2026 ·44m