In this episode, Paul was asked the following question. Listen as Paul breaks down a question about if a metal wireway is used above a panel and interposed between an EMT raceway and a small 18” EMT Raceway, often called a nipple. Does the wireway have to meet the same “straight” as “Eight” requirements in 314.28(A)(1) even if not being used as a “pull box”. Also, he answers a question, in his opinion, of the lack of SCCR ratings on commercial HVAC equipment that may cause a conflict with 110.10 of the National Electrical Code.Listen as Paul Abernathy, CEO, and Founder of Electrical Code Academy, Inc., the leading electrical educator in the country, discusses electrical code, electrical trade, and electrical business-related topics to help electricians maximize their knowledge and industry investment.If you are looking to learn more about the National Electrical Code, for electrical exam preparation, or to better your knowledge of the NEC then visit https://fasttraxsystem.com for all the electrical code training you will ever need by the leading electrical educator in the country with the best NEC learning program on the planet.Become a supporter of this podcast: https://www.spreaker.com/podcast/master-the-nec-podcast--1083733/support.Struggling with the National Electrical Code? Discover the real difference at Electrical Code Academy, Inc.—where you’ll learn from the nation’s most down-to-earth NEC expert who genuinely cares about your success. No fluff. No gimmicks. Just the best NEC training you’ll actually remember.Visit https://FastTraxSystem.com to learn more.

In this episode, Paul was asked the following question. Listen as Paul breaks down a question about if a metal wireway is used above a panel and interposed between an EMT raceway and a small 18” EMT Raceway, often called a nipple. Does the wireway have to meet the same “straight” as “Eight” requirements in 314.28(A)(1) even if not being used as a “pull box”. Also, he answers a question, in his opinion, of the lack of SCCR ratings on commercial HVAC equipment that may cause a conflict with 110.10 of the National Electrical Code.Listen as Paul Abernathy, CEO, and Founder of Electrical Code Academy, Inc., the leading electrical educator in the country, discusses electrical code, electrical trade, and electrical business-related topics to help electricians maximize their knowledge and industry investment.If you are looking to learn more about the National Electrical Code, for electrical exam preparation, or to better your knowledge of the NEC then visit https://fasttraxsystem.com for all the electrical code training you will ever need by the leading electrical educator in the country with the best NEC learning program on the planet.Become a supporter of this podcast: https://www.spreaker.com/podcast/master-the-nec-podcast--1083733/support.Struggling with the National Electrical Code? Discover the real difference at Electrical Code Academy, Inc.—where you’ll learn from the nation’s most down-to-earth NEC expert who genuinely cares about your success. No fluff. No gimmicks. Just the best NEC training you’ll actually remember.Visit https://FastTraxSystem.com to learn more.

NOW PLAYING

Let’s Ask Paul Podcast | Episode 210 | Are Wireways Pull Boxes and HVAC’s SCCR Ratings Issue

0:00 1:02:24

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of Master The NEC - PODCAST?

This episode is 1 hour and 2 minutes long.

When was this Master The NEC - PODCAST episode published?

This episode was published on July 15, 2025.

What is this episode about?

In this episode, Paul was asked the following question. Listen as Paul breaks down a question about if a metal wireway is used above a panel and interposed between an EMT raceway and a small 18” EMT Raceway, often called a nipple. Does the wireway...

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Master The NEC - PODCAST episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!