Skip to content
Leveling the Playing Field with Facilities Upgrades episode artwork

Oct 2, 2020 25 min

Leveling the Playing Field with Facilities Upgrades

from Tiger Talk TV Hosted by THEE Cory C

Following the release of renderings of phase 1 of the highly anticipated facilities upgrades, we take a quick look at how this potentially “levels the playing field.” Donate to the COVID-19 Athletic Relief Fund at www.gojsutigers.com/give, and be sure to download/subscribe to the podcast to be notified of each new episode. Apple users, rate and review the show. Everyone go follow Tiger Talk With the 1400 Klub on Facebook, and @TigerTalk1400 on Twitter. Go Tigers! #THEEiLove 💙🤍🐯 #IBelieve http://www.facebook.com/tigertalk1400 http://www.twitter.com/tigertalk1400 Send in a voice message: https://anchor.fm/tigertalk1400klub/message Support this podcast: https://anchor.fm/tigertalk1400klub/support

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Leveling the Playing Field with Facilities Upgrades

0:00 25:31

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Tiger Talk TV?

This episode is 25 minutes long.

When was this Tiger Talk TV episode published?

This episode was published on October 2, 2020.

Can I download this Tiger Talk TV episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.