Liberty Gold CEO Jon Gilligan on Black Pine's Path to a 2028 Construction Decision episode artwork

EPISODE · Jun 19, 2026 · 21 MIN

Liberty Gold CEO Jon Gilligan on Black Pine's Path to a 2028 Construction Decision

from Mining Stock Daily · host Trevor Hall

In this Mining Stock Daily interview, Liberty Gold CEO Jon Gilligan breaks down Black Pine's growing oxide gold resource, now at 4.88 million indicated ounces, and the project's low-cost, high-leverage economics heading into a Q4 2026 Feasibility Study. He addresses the gap between the PFS base case and headline gold-price scenarios, the company's cost structure and capital needs, and what's left to prove before a 2028 construction decision.

Episode metadata supplied by the publisher feed · Published Jun 19, 2026

Embed this episode

NOW PLAYING

Liberty Gold CEO Jon Gilligan on Black Pine's Path to a 2028 Construction Decision

0:00 21:08

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Mining Stock Daily?

This episode is 21 minutes long.

When was this Mining Stock Daily episode published?

This episode was published on June 19, 2026.

Can I download this Mining Stock Daily episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!