Skip to content
Limerick (Bunlicky) Wastewater Treatment Plant episode artwork

EPISODE · Sep 2, 2026 · 10 MIN

Limerick (Bunlicky) Wastewater Treatment Plant

from Live95 Limerick Today Podcasts

We begin this morning with a major piece of infrastructure that could have a huge bearing on the future development of Limerick. Uisce Éireann is seeking planning permission to massively upgrade the Bunlicky Wastewater Treatment Plant in Limerick. The aim is to increase the city’s capacity to deal with wastewater so that more houses and businesses can be built without the wastewater system becoming a constraint on growth. Paul Fallon, Senior Portfolio Manager on the Limerick (Bunlicky) Wastewater Treatment Plant and Regional Bioresource Centre project, joins the show. Image via Uisce Éireann. Hosted on Acast. See acast.com/privacy for more information.

Episode metadata supplied by the publisher feed · Published Sep 2, 2026

Embed this episode

Ready to play

Limerick (Bunlicky) Wastewater Treatment Plant

0:00 10:01

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Live95 Limerick Today Podcasts?

This episode is 10 minutes long.

When was this Live95 Limerick Today Podcasts episode published?

This episode was published on September 2, 2026.

Can I download this Live95 Limerick Today Podcasts episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!