EPISODE · Jun 12, 2025 · 1 MIN
LISTEN: Town Wants Pot Taxes to Fund Legal Fight with Battery Manufacturer
from IEN Radio · host Eric Sorensen
Green Charter Township has been locked in a legal battle with Gotion, a Chinese battery manufacturer, for more than a year now. At one time, Gotion was set to build a $2.6 billion electric vehicle battery factory near the central Michigan town.
Embed this episode
Ready to play
LISTEN: Town Wants Pot Taxes to Fund Legal Fight with Battery Manufacturer
0:00
1:56
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of IEN Radio?
This episode is 1 minute long.
When was this IEN Radio episode published?
This episode was published on June 12, 2025.
Can I download this IEN Radio episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!