Livingston Avenue Bridge episode artwork

EPISODE · Jan 20, 2026 · 25 MIN

Livingston Avenue Bridge

from The DOT POD · host NYSDOT - The DOT POD

The Livingston Avenue Bridge has been carrying trains across the Hudson River since the Civil War era. Now, more than 150 years later, it's being replaced to meet the needs of modern rail travel while also expanding pedestrian access with a design that respects its historic roots. On this episode of the DOT POD, Josh and Anya welcome in Jeff Moryl, Director of DOT's Project Management Office, and Sue Torelli, Director of DOT's Rail Projects Group, to talk about the bridge's history, why it matters so much, and what it take to replace a critical rail crossing without stopping the trains and passengers that rely on it every day.

Episode metadata supplied by the publisher feed · Published Jan 20, 2026

Embed this episode

Ready to play

Livingston Avenue Bridge

0:00 25:56

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The DOT POD?

This episode is 25 minutes long.

When was this The DOT POD episode published?

This episode was published on January 20, 2026.

Can I download this The DOT POD episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!