Livingston Manor Eyes Long-Term Flood Fix with Willowemoc Floodplain Restoration episode artwork

EPISODE · Apr 15, 2026 · 11 MIN

Livingston Manor Eyes Long-Term Flood Fix with Willowemoc Floodplain Restoration

from Radio Chatskill · host Various hosts

Local leaders and environmental advocates are looking to reduce flooding in downtown Livingston Manor, where severe flooding has persisted for decades. Livingston Manor was recently awarded a $4.7 million state grant to restore 11 acres of Willowemoc Creek’s historic floodplain and drastically reduce flooding in the area. But some local leaders worry about how the project could affect school property.Radio Catskill’s Kimberly Izar spoke with Town of Rockland Supervisor Rob Eggleton, Tracy Brown of Trout Unlimited, and Emily Perkins and James Woidt of Redfish Engineering about the project.

Episode metadata supplied by the publisher feed · Published Apr 15, 2026

Embed this episode

Ready to play

Livingston Manor Eyes Long-Term Flood Fix with Willowemoc Floodplain Restoration

0:00 11:25

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Radio Chatskill?

This episode is 11 minutes long.

When was this Radio Chatskill episode published?

This episode was published on April 15, 2026.

Can I download this Radio Chatskill episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!