London's Wet Wipe Island: Work starts to remove congealed waste from River Thames  episode artwork

EPISODE · Aug 11, 2025 · 14 MIN

London's Wet Wipe Island: Work starts to remove congealed waste from River Thames

from The Standard

London’s disgusting Wet Wipe Island is finally set to be removed from the Thames, with work under way to excavate the estimated 180 tonnes of congealed waste near Hammersmith Bridge. We hear from John Sullivan, Thames Water’s Head of Tideway Integration Group, and Emily Carr, policy adviser at the independent think tank and charity Green Alliance, about how to prevent more waste from accumulating in the capital’s waterways.And in part two, The Standard’s Head of Culture Martin Robinson joins us to discuss FX’s’s Alien:Earth series, which is released tomorrow, and the accompanying alien egg on display at London’s Natural History Museum.  Hosted on Acast. See acast.com/privacy for more information.

Episode metadata supplied by the publisher feed · Published Aug 11, 2025

Embed this episode

Ready to play

London's Wet Wipe Island: Work starts to remove congealed waste from River Thames

0:00 14:15

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Standard?

This episode is 14 minutes long.

When was this The Standard episode published?

This episode was published on August 11, 2025.

Can I download this The Standard episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!