Looking for a turnaround in transmission episode artwork

EPISODE · Nov 20, 2025 · 29 MIN

Looking for a turnaround in transmission

from Catalyst with Shayle Kann · host Latitude Media

After years of stalled transmission buildout, there are new signs of progress. Earlier this month, SPP approved $8.6 billion in transmission projects across 14 states. Major plans are emerging in MISO, PJM, and ERCOT. Despite the DOE canceling its loan guarantee, the Grain Belt Express is still moving forward. And regardless of court battles, so is the New England Clean Energy Connect.  Are these signs that the U.S. could start building transmission at scale again? In this episode, Shayle talks to Rob Gramlich, founder and president of Grid Strategies. He and Shayle cover topics like: Why Rob says the DOE’s efforts to fast-track large-load interconnection is a positive sign for transmission buildout The recent buildout of 880 miles of transmission and why it may look better than it is Why transmission hasn’t benefited from data center investment  Specific projects, including SPP’s transmission backbone and the Grain Belt Express Rob’s outlook on buildout over the coming year The uncertain future of permitting reform despite bipartisan support Resources: Catalyst: Unpacking DOE’s proposal to transform data center interconnection    Latitude Media: How the Grain Belt Express lost its LPO loan   E&E News: Data center growth cited in defense of MISO transmission plan  Fill out our short podcast listener survey for a chance to win a $100 Amazon gift card. Credits: Hosted by Shayle Kann. Produced and edited by Daniel Woldorff. Original music and engineering by Sean Marquand. Stephen Lacey is our executive editor.  Catalyst is brought to you by EnergyHub. EnergyHub helps utilities build next-generation virtual power plants that unlock reliable flexibility at every level of the grid. See how EnergyHub helps unlock the power of flexibility at scale, and deliver more value through cross-DER dispatch with their leading Edge DERMS platform, by visiting energyhub.com.Catalyst is brought to you by Bloom Energy. AI data centers can’t wait years for grid power—and with Bloom Energy’s fuel cells, they don’t have to. Bloom Energy delivers affordable, always-on, ultra-reliable onsite power, built for chipmakers, hyperscalers, and data center leaders looking to power their operations at AI speed. Learn more by visiting BloomEnergy.com.

Episode metadata supplied by the publisher feed · Published Nov 20, 2025

Embed this episode

Ready to play

Looking for a turnaround in transmission

0:00 29:15

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Catalyst with Shayle Kann?

This episode is 29 minutes long.

When was this Catalyst with Shayle Kann episode published?

This episode was published on November 20, 2025.

Can I download this Catalyst with Shayle Kann episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!