EPISODE · Sep 4, 2026 · 2 MIN
Lubbock’s Loop 88 Phase 3C Begins | Lubbock News
from Lubbock Daily News Now | 2 Min News | The Daily News Now!
Big changes are coming to Lubbock’s roads as TxDOT kicks off Phase 3C of turning FM 1585 into Loop 88 — the city’s second major state loop. Starting September 9, this $221 million project will transform a two-lane road into a six-lane freeway with frontage roads, bridges, and new ramps between Avenue U and I-27, stretching from 114th to 146th Streets. Drivers can expect reduced lanes, slower speeds, and major interchange work — all part of a larger plan to connect US 87 to US 62/82 in Wolfforth. Construction is slated for completion by fall 2031 — so buckle up, stay alert, and prepare for delays as Lubbock builds its future infrastructure. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/e3048e2fcab12659
Embed this episode
Ready to play
Lubbock’s Loop 88 Phase 3C Begins | Lubbock News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.