Lyndon’s Permanent Bridges Rise | Montpelier News episode artwork

EPISODE · Jul 30, 2026 · 1 MIN

Lyndon’s Permanent Bridges Rise | Montpelier News

from Montpelier News Today | 2 Min New | The Daily News Now!

After two years of devastation, Lyndon’s flood recovery is finally hitting full stride as permanent bridges replace temporary ones on Red Village Road — a major milestone in rebuilding the town’s infrastructure. With an $18 million line of credit keeping momentum while waiting for FEMA reimbursements, crews kicked off construction Monday and aim to finish the second bridge next week. For residents, the sight of these new structures is both a bittersweet reminder of loss and a hopeful sign of resilience. Officials are racing to wrap up all recovery efforts by fall, determined to restore Lyndon to its pre-flood self — stronger, more prepared, and ready to move forward. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/820c20718f8b081a

Episode metadata supplied by the publisher feed · Published Jul 30, 2026

Embed this episode

NOW PLAYING

Lyndon’s Permanent Bridges Rise | Montpelier News

0:00 1:23

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Montpelier News Today | 2 Min New | The Daily News Now!?

This episode is 1 minute long.

When was this Montpelier News Today | 2 Min New | The Daily News Now! episode published?

This episode was published on July 30, 2026.

Can I download this Montpelier News Today | 2 Min New | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!