M50 at capacity and speeding up infrastructure delivery episode artwork

EPISODE · Dec 3, 2025 · 31 MIN

M50 at capacity and speeding up infrastructure delivery

from Behind the Story · host RTÉ News

The country's most famous road is officially at capacity but can anything be done to improve journey times on the M50? Reporter Conor McMorrow joins Fran and Maggie to outline the issues with the M50 and reveal a few interesting facts such as why there is no junction 8! Later, Assistant Professor and Architect Orla Hegarty of UCD joins the duo to explain the government new report - 'Acclerating Infrastructure' which outlines actions to speed up the delivery of critical projects. See omnystudio.com/listener for privacy information.

Episode metadata supplied by the publisher feed · Published Dec 3, 2025

Embed this episode

NOW PLAYING

M50 at capacity and speeding up infrastructure delivery

0:00 31:43

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Behind the Story?

This episode is 31 minutes long.

When was this Behind the Story episode published?

This episode was published on December 3, 2025.

Can I download this Behind the Story episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!