Skip to content
Magna Mining Moves Forward With Levack Mine Restart episode artwork

Oct 8, 2026 19 min

Magna Mining Moves Forward With Levack Mine Restart

from Mining Stock Daily Hosted by Trevor Hall

Magna Mining CEO Jason Jessup joins Mining Stock Daily to discuss the company's decision to restart the Levack Mine in Sudbury, following the release of a preliminary economic assessment outlining approximately $70 million in initial capital, a 0.6-year payback and commercial production targeted for mid-2028. Jessup explains how existing third-party processing infrastructure and pre-production revenues help keep funding requirements low, while the high-grade R2 zone offers potential upside beyond the current mine plan. The conversation also covers the upcoming Crean Hill prefeasibility study, hiring and construction plans, and Magna's strategy to generate cash flow from copper, nickel and precious metals operations.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Magna Mining Moves Forward With Levack Mine Restart

0:00 19:31

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Mining Stock Daily?

This episode is 19 minutes long.

When was this Mining Stock Daily episode published?

This episode was published on October 8, 2026.

Can I download this Mining Stock Daily episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.