Hello, Roy here. I just wanted to let you know that you can listen to the Roy Green Show ad-free on Amazon Music, included with Prime. I do know that as we speak, the President has ordered the Army Corps to deploy right now to help with the clearing under the bridge to open that shipping channel. I believe we'll also have some U.S.
Navy assets deployed to help with that effort. The Coast Guard is here as we speak as part of the search and rescue operation. So the federal government is a full partner with the city of Baltimore and the mayor of Baltimore and with Maryland, our governor. That's the voice of Maryland Senator Chris Van Halden on that bridge collapse.
The Francis Scott Key Bridge collapsed in Baltimore, you know, after being struck by the container ship, Dolly. So one of the first questions is, could this be avoided? And the second question most people have is, could this happen in Canada? So my question was, how does one of Canada's most experienced bridge construction engineers assess the collision and what might the likelihood be of a bridge collapse under similar circumstances in Canada?
And so we have the opportunity and it's a privilege to speak with Dr. Helen Tristadulu, Executive Vice President of Engineering, Sustainability, and Business Development at Corvette, Canada. Dr. Tristadulu has more than 40 years' experience in the field of bridges and major bridge structures across this country and the United States and supervision of major bridge projects.
She has a Ph.D. in civil engineering. She's a lawyer and an MBA. It's been a while since we've spoken, Helen.
The last time I think was when you and I, while I was in Montreal, I'm back in Ontario now, but at the time we were all concerned about the Champlain Bridge, which crosses St. Lawrence River from the south shore to Montreal, a huge span. And I felt every time I drove over it, it wobbled. But I think everybody felt that way on that bridge.
Hi, Roy, how are you? I'm good. Good to talk to you again. Good, very good to talk to you.
And of course, there's a new bridge now in place of the Champlain. So, Helen, where does the investigation have to begin in Baltimore? With the bridge construction, does it have to begin with the ship? It's the first focus, the container ship, which carried some 4,700 containers and had sent to May Day loss.
Where does it begin? Well, the way I see it, it's really, if we're going to take a disaster, first of all, I really feel my heartfelt condolence to the family. Yes, of course. But I think there's three major lessons.
If we're going to break it up in components. First, yes, to your point, we're looking at the ship that was like 300 meters long and carried over 100,000 tons. So this bridge was not designed for this type of load because when it was first directed, it's not intended to have ships running into the bridge with 100,000 tons of cargo, right? So first is to look at that type of thing with respect to how were the mechanisms around the bridge to protect itself.
You know, they have these so-called dolphin structures, right, around the water, because this particular span, as you know, had these dolphin structures, but they were not. Basically, they sacrificed themselves in the event that the ship runs into it. They absorbed that energy, but they weren't enough because the ship was massive. They weren't designed with that in mind.
So that is one. A lot of engineers agree that, yes, they were in place, but certainly not enough to withstand that type of impact, the collision, right? So, A, they have to assess if this was not done, was there a thought process or not. Then I think one of the most important parameters that I feel is that, I'll go to the design in a second, but inspection was the other issue raised.
The critical part would be to assess, have there been regular inspections and have the issues been documented? In other words, were there fatigue cracks on the bridge? Were there dense, other impact loading? Were there loss of sections, parts corroded because of the steel span, right?
Was it misaligned? Were there flaws in the connections in assembly? So this is something that has to be verified in terms of what has been done to see if any of that contributed in general. But the most important part is that this type of bridge that, you know, was designed then, and now they are designed, but I'll tell you, with improvements, right, this was what we call a fracture-critical bridge.
And basically what that means is any steel member intention that if it collapses, the entire bridge is going to collapse. There is no redundancy in that bridge. In other words, it's not designed in such a way that any other member will take part of that force, let's say, to minimize that effect, right? And now new steel bridge designs have this type of redundancy included for damage control for members that are internally redundant, for steels, for example, now, because you mentioned it would have in Canada, steels would increase fracture resistance, right, to ensure that this damage protection is heightened, right?
These type of bridges are less and less and less, but to this way. There are a number of inspections with high probability of damage detection now, so this is less and less prominent. But the issues are many. And the idea of actually giving the amount of documentation that they have to rematch, you know, to collect in order to come to some determination, it's just multifaceted, because you're not only talking about looking at an old structure and what it had and didn't have, but also the condition that it was, it was a contributory factor to the actual mass that slammed into it and actually created this devastating effect.
No. Helen, was this an accident waiting to happen, that bridge, that harbor, those big ships? The Dolly, as I understand it, well, it isn't the biggest of container ships. It carried 4,700 containers, but there are ships that carry 24,000 containers.
Yes, absolutely. But yes, I think it was, because in this type of bridge, certainly, you know, it's a continuous cross bridge, right? And it's three sections. And two of these bridge sections appears are navigable waters.
So even though there were these understructures, with the intention to sacrifice out of any force of a wayward ship, they weren't enough, right? They weren't designed for this massive ship. So support or not, it requires now designers to think, now, any type of structure as such should have a consideration of looking at what is the biggest vessel that can probably hit, right? To make sure that you have these mechanisms in place.
So to your question, no, it was something that, in waiting, to happen. But my concern is the contributing factors. Yes, it is non-redundant, and yes, if one member fails, everything will fail. So A, did you have the protective mechanisms to buffer that impact?
But on the other, you know, what was the condition? Was it properly inspected such that everything was up to par? You know what I mean? And these are extremely critical factors.
It's going to be a long investigation because certainly they, you know, a lot of these individual type of groups, I would say, with the expertise will have to evaluate differently because what the impact of the foundation part appears is one thing. The inspection part, what they did and what they did not is another. And the type of design looking forward in the future is, you know, a whole different department. Yeah, so you said on this bridge, on the Francis Scott Key Bridge, that they did have, and I call them fenders.
Is that the right term? Yes, we do. Because, you know, the fenders is something that separates two boats or two ships. Well, this was a bridge that was dealing with massive ships.
So they had fenders in place, and they also had built-up barriers under the surface of the water to deflect. They were. Just the ship was too vague. That's what they call them, yeah.
They're just working, capable of resisting that effect. Yeah. Is it possible? You know what I mean?
How would you do if you were designing and engineering a bridge for that particular harbor with that kind of traffic, with ships that are five times as big as the one that crashed into the bridge? What would you do to protect it from that kind of a collision? Is it possible to engineer a bridge that would be able to absorb and stay vertical a collision with a ship that massive traveling at eight to ten knots? Absolutely.
What I mentioned to you before is now the type of designs, the new bridge designs, right? They take a refuge of efficiency, right? So the systems are designed for redundancy to make sure that bridges are more tolerant to damage, right? The steels have increased fracture resistance.
And the peers that are built are massive, taking all these type of factors into consideration. There are a lot of different type of designs in structures. Like they have a – make sure that there's a load pass redundancy to make sure there's a load on one port. It actually could transfer to another like encoders and structures.
But there's structural redundancy because they look at members with more support of the mechanism that is structurally redundant. And then they have secret sections. So there's a lot of ways. We have tables, we have blocks, we have bridges, the designs have evolved, the fields have evolved.
So that is part of the reflection of these type of problems. And remember, I used to be the National Director of the United Institute of Construction, and I audited when we have fracture critical bridges. There's an audit process, right, to make sure that a lot of these redundancy, if you wish, these controls are in place, right? So there are mechanisms designed.
It's evolving. You have AASHTO and all the other regulatory bodies, if you wish, to include a fracture control plan, for example, that it's a special plan. So today it's unavoidable. That bridge, it was unavoidable that eventually something like this was likely to happen given the size of the ships.
Helen, are there bridges such as the one that existed in Baltimore? And what I'm asking is, is a similar situation possible in this country? For sure they are, there's no doubt, which makes more and more critical, what I mentioned before, the consistent inspection to make sure that everything is up to par. And often there are some measures that are taken in order to consider some members that are obviously because of fracture critical or structurally redundant, that they support in such a way that they make some additions in order to make sure that in case there is a problem, basically the member changes the system behavior, right?
And it does not result in a collapse of that superstructure. So there are ways. And then there are other ways which you could create, I call internal redundancy, which is basically build up certain members such that in an effort to prevent failure propagation. Because that's what happened in this, one member broke and then it was like a domino effect.
But the inspection process to make sure that along the lifespan, we need to expand, right? Or check for fractures, for fatigue, for loss of inspection, is extremely important. But nowadays, going forward, the designs are not as such. There are indespecifications, there are requirements, both in the states and in Canada, that there are fracture critical control points, right?
So follow through the fabrication and the inspection process to make sure and detect the presence of, let's say, rejectable discontinuities, cracks, or any type of damage position that will result in a safety concern. So what I mentioned before, part of the certification process is to make sure that these plans are there and they're followed through. However, a lot of these types of spans themselves, as you see, they're just not done anymore. These are old designs we have in the process.
Looking at that bridge, to me, and I don't have an expert's eye, obviously, but I thought, I can't imagine how that bridge possibly could have survived a collision with a ship like that. It's just too massive. And they did have the fenders and the built-up barriers. So we have about two minutes here.
Does that suggest that an inspection took place? And for whatever reason, they didn't engineer the necessary barriers to preclude this kind of accident. Well, the inspection, it's twofold, right? Because the inspection could be on the actual steel structure itself.
So we don't know exactly what they expected. And if they missed anything, any cracks, as I mentioned before, in any deficiency, right? The fact that these fenders were not there, or the dolphins of the fenders, right? They're close to the pier, at least in the navigable water part, right?
We don't know if it was a thought process to enlarge or improve, right? As it is, they were insufficient. That is a fact, they were insufficient. So the decision process, why were they made if there were not any plans to expand or to under-evaluate the fact that you do have large, massive cargo ships that pass through?
So there is a discontinuity in the thought process. There is a discontinuity in the follow-up to make sure that it's up to par. I mean, nobody could say that anybody believed that this fan that was built in the 70s actually could pick up the loads from an impact that it did 50 years ago. Yeah, yeah.
Ellen, I have to end it here because we're simply out of time. But I do appreciate that you're joining us. And thanks so much. Good to hear you again.
Thanks. My pleasure. You took a great work, Roy. Take care.
Have a good evening. And yeah, to you as well. If you want to hear more, subscribe to The Roy Green Show on Apple Podcasts, Google Podcasts, Spotify, Stitcher, or wherever you find your favorites. And if you like what you hear, leave us a review and tell a friend.
I'm Roy Green. Have a great weekend. It's the Jeep 85-year celebration. It's 85 years of daring to ask what if.
Like what if we didn't sacrifice capabilities for comfort. Or what if nothing on the road ahead could hold us back. For decades, we've chased every what if, why not, who, where, and how. And the answer, because we can.
Right now, get 3% financing for up to 84 months on select models. Plus, eligible customers get $1,850 in Jeep anniversary bonus cash on all Jeep models. See your Jeep dealer for details.