Mashaba questions R121 million Shalazile electrification project episode artwork

EPISODE · Jul 14, 2026 · 11 MIN

Mashaba questions R121 million Shalazile electrification project

from Kaya 959 · host Phemelo Motene

ActionSA leader Herman Mashaba has accused the City of Johannesburg of failing residents at the Shalazile Informal Settlement, despite spending R121 million on an electrification project. Following an oversight visit, Mashaba raised concerns over allegations of excessive spending, persistent power outages and poor living conditions, saying families continue to live without adequate sanitation, drainage and reliable basic services. The settlement was established to house survivors of the 2023 Usindiso building fire, but residents say they remain neglected. Phemelo speaks to ActionSA leader Herman Mashaba about the findings and the allegations against the city. www.kaya959.co.za · Kayafm

Episode metadata supplied by the publisher feed · Published Jul 14, 2026

Embed this episode

NOW PLAYING

Mashaba questions R121 million Shalazile electrification project

0:00 11:54

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Kaya 959?

This episode is 11 minutes long.

When was this Kaya 959 episode published?

This episode was published on July 14, 2026.

Can I download this Kaya 959 episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!