Maspero Elevatori Wins VT Contract For Palais Des Nations episode artwork

EPISODE · May 25, 2021 · 7 MIN

Maspero Elevatori Wins VT Contract For Palais Des Nations

from Elevator World · host Elevator World

Welcome to the Elevator World News Podcast. Today’s podcast news podcast is sponsored by elevatorbooks.com: www.elevatorbooks.com MASPERO ELEVATORI WINS VT CONTRACT FOR PALAIS DES NATIONS Maspero Elevatori has been awarded a more-than-EUR2.8-million (US$3.4-million) contract for the vertical-transportation (VT) portion of renovation of the historic Palais des Nations, the United Nations (UN) European headquarters (HQ) in Geneva, Switzerland. VT work is scheduled to start in October. The first step will be replacing doors and gears and installing new-generation electrical panels to maximize safety and energy efficiency on 25 elevators. The first modernized lifts are due to be complete in the first quarter of 2022. Maspero is also designing 11 new lifts, with construction set to start in 2022 and installation by the end of 2023. All elevators will be connected to a monitoring system that sends data to a control room, allowing supervision, monitoring and management of access and movement to ensure safety and security. Cloud-based software and a series of sensors will monitor functioning, allowing automatic detection of faults and activating or deactivating access to certain floors, if necessary. After the NYC HQ, the 100,000-m2 Palais des Nations, situated on 46 ha in Ariana Park overlooking Lake Geneva, is the UN’s most important international operations center. Built between 1929 and 1936, it is one of the busiest diplomatic centers in the world. Webuild-CMB-Italiana Construczioni joint venture is handling the overall renovation with a focus on protection of historical heritage, work safety and accessibility. Image credit: © figurniy To read the full transcript of today's podcast, visit: elevatorworld.com/news Subscribe to the Podcast: iTunes │ Google Play | SoundCloud │ Stitcher │ TuneIn

Episode metadata supplied by the publisher feed · Published May 25, 2021

Embed this episode

NOW PLAYING

Maspero Elevatori Wins VT Contract For Palais Des Nations

0:00 7:34

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Elevator World?

This episode is 7 minutes long.

When was this Elevator World episode published?

This episode was published on May 25, 2021.

Can I download this Elevator World episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!