Massive ‘fatberg’ cleared from Richmond’s sewer system episode artwork

EPISODE · Oct 25, 2024 · 10 MIN

Massive ‘fatberg’ cleared from Richmond’s sewer system

from The Jill Bennett Show · host CKNW / Curiouscast

GUEST: Dana Zheng, Program Manager, Source Control Planning and Management at Metro Vancouver Learn more about your ad choices. Visit megaphone.fm/adchoices

Episode metadata supplied by the publisher feed · Published Oct 25, 2024

Embed this episode

NOW PLAYING

Massive ‘fatberg’ cleared from Richmond’s sewer system

0:00 10:28

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Jill Bennett Show?

This episode is 10 minutes long.

When was this The Jill Bennett Show episode published?

This episode was published on October 25, 2024.

Can I download this The Jill Bennett Show episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!