Skip to content
Máxima electricidad episode artwork

EPISODE · Sep 13, 2011 · 5 MIN

Máxima electricidad

from El Sureño

Reportaje periodístico de Yamilaine González y Claudia Martínez Bueno, de Radio Ciudad del Mar, sobre el trabajo desarrollado en la termoeléctrica Carlos Manuel de Céspedes, de Cienfuegos, para producir electricidad con eficiencia.

Episode metadata supplied by the publisher feed · Published Sep 13, 2011

Embed this episode

Ready to play

Máxima electricidad

0:00 5:27

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of El Sureño?

This episode is 5 minutes long.

When was this El Sureño episode published?

This episode was published on September 13, 2011.

Can I download this El Sureño episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!