EPISODE · Sep 14, 2026 · 1 MIN
Meta Expands Eagle Mountain Campus | Salt Lake City News
from Salt Lake City News Today | 2 Min News | The Daily News Now!
Meta’s massive Eagle Mountain data center expansion is set to transform the local community—with over $2.5 million in investments pouring into schools, a new astronomy park, and land for future classrooms. This second phase of growth, following the 2021 launch, will eventually cover five million square feet and bring hundreds of local jobs. The mayor praised Meta’s consistent commitment since 2018, highlighting real benefits for education and infrastructure. Environmentally, Meta’s new buildings use dry-cooled, closed-loop systems that eliminate water usage during operations—and they’re actively restoring local watersheds like Hobble Creek and the Provo River, proving tech giants can build big while caring for the planet. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Sources:https://kutv.com/news/local/meta-plans-eagle-mountain-data-center-expansion-25m-community-investment More coverage & latest updates:https://sources.thednn.ai/d8ab6918c047593e Report issues to [email protected].
Embed this episode
Ready to play
Meta Expands Eagle Mountain Campus | Salt Lake City News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.