Michael Pink Advanced Construction Schedule Controls at SmartPM
from Constructed Futures, An AI Edge Podcast Hosted by Michael Pink
Follow Michael here Check out SmartPM here: https://smartpm.com/ email Michael at [email protected]
Embed this episode
What this episode covers
Construction Schedules are notoriously complex and ever changing. SmartPM gives project teams the ability to look at their schedules at various levels, to understand the project, dive into the details, and zoom back to see trends and the overall picture. CEO Michael Pink walks us through the platform and its many benefits
No transcript yet.