Mike Wagar: Operations Supervisor @ Bay Area Water Treatment Plant, Bay City Michigan episode artwork

EPISODE · Jul 22, 2025 · 48 MIN

Mike Wagar: Operations Supervisor @ Bay Area Water Treatment Plant, Bay City Michigan

from Public Works Podcast · host Joseph Blackman

Mike Wagar, Operations Supervisor at Bay Area Water Treatment Plant, shared insights into the plant's operations, staff responsibilities, and challenges, including the unique 12-hour shift schedule, difficulties in hiring and training, and handling chemical non-compliance. Mike Wagar also detailed his daily responsibilities as a supervisor, emphasizing the importance of patience and people skills, and discussed the plant's continuous improvement efforts, public transparency, and future concerns about water storage. Give the show a listen and remember to thank your local Public Works Professionals.

Episode metadata supplied by the publisher feed · Published Jul 22, 2025

Embed this episode

NOW PLAYING

Mike Wagar: Operations Supervisor @ Bay Area Water Treatment Plant, Bay City Michigan

0:00 48:36

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Public Works Podcast?

This episode is 48 minutes long.

When was this Public Works Podcast episode published?

This episode was published on July 22, 2025.

Can I download this Public Works Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!