EPISODE · Apr 1, 2026 · 1 MIN
Milestone reached as the first transmission tower installed in the Central West Orana REZ
from LiSTNR Dubbo Local News · host LiSTNR
Also; Councils issue an urgent call for the state government to ensure they have enough fuel to keep up essential services like garbage collectionSee omnystudio.com/listener for privacy information.
Embed this episode
NOW PLAYING
Milestone reached as the first transmission tower installed in the Central West Orana REZ
0:00
1:10
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of LiSTNR Dubbo Local News?
This episode is 1 minute long.
When was this LiSTNR Dubbo Local News episode published?
This episode was published on April 1, 2026.
Can I download this LiSTNR Dubbo Local News episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!