Skip to content
Minot: Foot Bridge Extraction Attempt, Part 2 episode artwork

Apr 20, 2023 2 min

Minot: Foot Bridge Extraction Attempt, Part 2

from Crisis Response Hosted by Unknown Author

National Guardsmen from North Dakota's 816th Engineers wrap up work with their civilian counterparts after an attempt to dislodge a downed foot bridge in Souris River that threatens the integrity of the town's dikes. Engineers prepare their bulldozers for transport back to the armory after a visit from Brigadier General William Seekins. Produced by Sgt. 1st Class Michael Houk.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Minot: Foot Bridge Extraction Attempt, Part 2

0:00 2:33

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Crisis Response?

This episode is 2 minutes long.

When was this Crisis Response episode published?

This episode was published on April 20, 2023.

Can I download this Crisis Response episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.