Modular isn't a product you order, it's a process you run | Randall Thompson episode artwork

EPISODE · May 28, 2026 · 49 MIN

Modular isn't a product you order, it's a process you run | Randall Thompson

from Built Different · host Tough Leaf

On Nibbi Brothers' modular projects, a 100-unit building goes up within two weeks of podium completion, delivering 10 to 15% hard cost savings and 25% faster project timelines. Instead of treating modular as a product you order and wait for, they approach it as a manufacturing process that demands pulled-forward preconstruction, early manufacturer engagement, and full-team coordination before a single module ships. Randall believes the industry hasn't captured the full cost benefit yet because trade partners are still pricing conservatively on the learning curve.Randall Thompson, Preconstruction Executive at Nibbi Prefab, tells Wissam how they bring manufacturers on as design-assist partners at Design Development 100%, with factory cost running roughly 20 to 25% of the overall GMP. The upfront coordination shifts the critical path: interior MEP and some finish work come off it, replaced by the sequence of foundations to module set to dry-in to site work. Their trade readiness process includes full-scale mock-ups of typical module corridor conditions and factory prototype visits before subs receive product on site.Randall also walks through how they solved modular's most expensive risk, water intrusion, by co-developing a temp-to-perm roofing system with a roofing manufacturer after early Bay Area projects generated significant claims during a wet winter. That system held through an atmospheric river just weeks after module set. He argues modular failures are execution problems, not technology problems. And unlike traditional construction's protectionist culture, the modular community shares knowledge openly, even with direct competitors, because the industry needs more successes to build market confidence.Topics discussed:Pulling procurement, BIM, and design coordination into preconstructionManufacturers as design-assist partners at Design DevelopmentFactory cost benchmarks at 20 to 25% of overall GMPCritical path shift when interior MEP leaves the scheduleTemp-to-perm roofing to solve water intrusion riskFull-scale mock-ups and factory visits for trade readinessReduced modular scopes creating access for smaller firmsAI-generated lessons learned checklists from project history

On Nibbi Brothers' modular projects, a 100-unit building goes up within two weeks of podium completion, delivering 10 to 15% hard cost savings and 25% faster project timelines. Instead of treating modular as a product you order and wait for, they approach it as a manufacturing process that demands pulled-forward preconstruction, early manufacturer engagement, and full-team coordination before a single module ships. Randall believes the industry hasn't captured the full cost benefit yet because trade partners are still pricing conservatively on the learning curve.Randall Thompson, Preconstruction Executive at Nibbi Prefab, tells Wissam how they bring manufacturers on as design-assist partners at Design Development 100%, with factory cost running roughly 20 to 25% of the overall GMP. The upfront coordination shifts the critical path: interior MEP and some finish work come off it, replaced by the sequence of foundations to module set to dry-in to site work. Their trade readiness process includes full-scale mock-ups of typical module corridor conditions and factory prototype visits before subs receive product on site.Randall also walks through how they solved modular's most expensive risk, water intrusion, by co-developing a temp-to-perm roofing system with a roofing manufacturer after early Bay Area projects generated significant claims during a wet winter. That system held through an atmospheric river just weeks after module set. He argues modular failures are execution problems, not technology problems. And unlike traditional construction's protectionist culture, the modular community shares knowledge openly, even with direct competitors, because the industry needs more successes to build market confidence.Topics discussed:Pulling procurement, BIM, and design coordination into preconstructionManufacturers as design-assist partners at Design DevelopmentFactory cost benchmarks at 20 to 25% of overall GMPCritical path shift when interior MEP leaves the scheduleTemp-to-perm roofing to solve water intrusion riskFull-scale mock-ups and factory visits for trade readinessReduced modular scopes creating access for smaller firmsAI-generated lessons learned checklists from project history

NOW PLAYING

Modular isn't a product you order, it's a process you run | Randall Thompson

0:00 49:13

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

She’s a Hazard to Herself She’s a Hazard Hi there, I’m Mallory, and I’d like to invite you into our world with “She’s a Hazard to Herself!” Join us as we navigate life with Multiple Sclerosis from the seat of my power wheelchair. Discover stories of resilience, family, and the community we’ve built around chronic illness. Whether you’re impacted by MS or want to learn from our journey, there’s something here for you. So why wait? Subscribe to “She’s a Hazard to Herself” on your favorite podcast app and be part of our journey today. Let’s lift each other up, one episode at a time! Why That with Wyatt Wyatt Your semi-weekly source for fun facts and deep dives into different topics! Please follow the show and share the link with anyone who doesn’t already listen! Rich Dad's Guide to Investing II Robert T. Kiyosaki II Full Audiobook II Robert T. Kiyosaki Investing means different things to different people… and there is a huge difference between passive investing and becoming an active, engaged investor. Rich Dad’s Guide to Investing, one of the three core titles in the Rich Dad Series, covers the basic rules of investing, how to reduce your investment risk, how to convert your earned income into passive income… plus Rich Dad’s 10 Investor Controls.The Rich Dad philosophy makes a key distinction between managing your money and growing it… and understanding key principles of investing is the first step toward creating and growing wealth. This book delivers guidance, not guarantees, to help anyone begin the process of becoming an active investor on the road to financial freedom. Hyperfluent Hypio Hyperfluent transmits straight from the heart of Hyperliquid, where culture, creativity, and capital converge. Anchored by the architects of Hypio—the decentralized cultural virus—each episode archives the minds engineering the blockchain built to house all finance. These conversations are traceable artifacts in HyperEVM’s evolution: not just what’s being built, but why it matters, how it mutates, and where it’s taking us next. Listen in for the blueprints, the blind spots, and the narrative weapons shaping tomorrow’s markets.Hyperfluent: learn the language, ride the wave, spread the strain.

Frequently Asked Questions

How long is this episode of Built Different?

This episode is 49 minutes long.

When was this Built Different episode published?

This episode was published on May 28, 2026.

What is this episode about?

On Nibbi Brothers' modular projects, a 100-unit building goes up within two weeks of podium completion, delivering 10 to 15% hard cost savings and 25% faster project timelines. Instead of treating modular as a product you order and wait for, they...

Can I download this Built Different episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!