Molecular Design and the Critical Path Problem
from Issues and Innovations in Drug Development presented by Aptuit
In this episode, Dr. Stephen Byrn, Head of Aptuit Scientific Advisory Board, speaks about the critical path problem in drug development and how a designed molecular delivery system can improve the drug development process.
Embed this episode
No transcript yet.
Frequently asked questions
When was this Issues and Innovations in Drug Development presented by Aptuit episode published?
This episode was published on September 9, 2008.
Can I download this Issues and Innovations in Drug Development presented by Aptuit episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.