Moore Butts Encore - Why Are Pipelines So Hard To Build? episode artwork

EPISODE · Jan 1, 2026 · 45 MIN

Moore Butts Encore - Why Are Pipelines So Hard To Build?

from The Bridge with Peter Mansbridge · host Peter Mansbridge, gerald butts, James Moore

Encore Episode. Alberta and Canada seem close to a deal on a memorandum of understanding about a new pipeline to the west coast. But now how do you make that MOU become a real finalized deal because let's face it, pipelines in Canada are hard to build. Hosted by Simplecast, an AdsWizz company. See pcm.adswizz.com for information about our collection and use of personal data for advertising.

Episode metadata supplied by the publisher feed · Published Jan 1, 2026

Embed this episode

Encore Episode. Alberta and Canada seem close to a deal on a memorandum of understanding about a new pipeline to the west coast. But now how do you make that MOU become a real finalized deal because let's face it, pipelines in Canada are hard to build. James Moore and Gerald Butts talk pipelines and the shift topics to talk jet fighters and the intense lobbying going on for those.

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

Moore Butts Encore - Why Are Pipelines So Hard To Build?

0:00 45:56

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Bridge with Peter Mansbridge?

This episode is 45 minutes long.

When was this The Bridge with Peter Mansbridge episode published?

This episode was published on January 1, 2026.

Can I download this The Bridge with Peter Mansbridge episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!