Mount Hope Bridge Potholes: Deep Dive into Causes & Solutions
from Providence News Today | 2 Min News | The Daily News Now!
Despite a recent $1.1 million resurfacing job, the Mount Hope Bridge is already showing signs of wear, with potholes appearing just months later. The issue lies in the bridges steel grid deck, filled with concrete and topped with unreinforced material thats been delaminating for decades. This allows water to seep in, causing the fresh surface to crack and pothole. Drivers are frustrated, especially with the current dehumidification project causing traffic backups. No quick fix is in sight, but a deep feasibility study is underway to consider replacing the upper deck layer or a full rehab of the nearly 100-year-old span. The bridge remains structurally sound, but towns like Bristol are suing for access to inspection reports amid the bumpy drama. Support the show: Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN: [email protected] This is an automated, high-level news summary based on public reporting. Report issues to [email protected]. View sources & latest updates: https://sources.thednn.ai/71e3a9d56647d84f
Embed this episode
No transcript yet.