EPISODE · Dec 15, 2015
Muda, Mura and Muri - Waste in SW-development - MES024
from Mastering Embedded Systems · host Georg Lohrer from EmbeddedSuccess.com
I have recorded this episode twice. Not by intention - far away from that. But I was neither convinced nor satisfied with the first recording. Also the subject was not really impressive and I decided to do it again from scratch. Thus I got a first hand impression what waste of time and effort is. However one detail in the first record was amazing. It was about waste in SW-development. You remember episode 4? Already there I have mentioned waste due to over-processing and over-engineering. Both are part of the 7 forms of regular waste in any kind of system. The Toyota Production System (TPS) has introduced to a broader audience the classification of waste forms. In this episode I wanted to connect traditional manufacturing based Kaizen and Muda, Mura, and Muri with Software-development. Is it possible? Do we have parallels? Or is the TPS not adaptable to nowadays IT-based technology? Stay with me and enjoy the show.
Embed this episode
NOW PLAYING
Muda, Mura and Muri - Waste in SW-development - MES024
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.