New Broulim’s Fieldhouse opens at Rigby High School episode artwork

EPISODE · Aug 21, 2026 · 16 MIN

New Broulim’s Fieldhouse opens at Rigby High School

from BYU-Idaho Radio · host BYU-Idaho Radio

The Rigby community gathered for the ribbon cutting of the new Broulim’s Fieldhouse. Rigby’s Athletic Director Ty Shippen gave BYU-Idaho Radio a tour of the new building.

Episode metadata supplied by the publisher feed · Published Aug 21, 2026

Embed this episode

NOW PLAYING

New Broulim’s Fieldhouse opens at Rigby High School

0:00 16:31

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of BYU-Idaho Radio?

This episode is 16 minutes long.

When was this BYU-Idaho Radio episode published?

This episode was published on August 21, 2026.

Can I download this BYU-Idaho Radio episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!