New Found Gold (TSXV:NFG) - Permitted Infrastructure Accelerates Path to Gold Production episode artwork

EPISODE · Feb 26, 2026 · 12 MIN

New Found Gold (TSXV:NFG) - Permitted Infrastructure Accelerates Path to Gold Production

from Company Interviews · host Crux Investor

Interview with Keith Boyle, Director & CEO of New Found GoldOur previous interview:  https://www.cruxinvestor.com/posts/new-found-gold-tsxvnfg-meet-the-team-hashim-ahmed-9202Recording date: 26th February 2026New Found Gold Corporation (TSXV: NFG) is executing a calculated strategy to fast-track its high-grade Queensway project into production through a infrastructure-focused acquisition approach. CEO Keith Bole recently detailed how the company's acquisition of the Hammerdown gold project and Pine Cove mill facility serves as the catalyst for bringing Queensway online by the end of 2027—approximately three years ahead of traditional greenfield development timelines.The acquisition rationale centers on accessing permitted milling infrastructure rather than resource ounces. "We wanted the mill and tailings for Queensway. That's what we were shooting for," Bole explained. By leveraging the existing Pine Cove facility, New Found Gold avoids the lengthy permitting process and construction delays associated with building new processing capacity from scratch.The company is currently ramping up 700 tons-per-day production at Hammerdown while simultaneously expanding the Pine Cove mill from 700 to 1,400 tons per day. This expanded capacity will process high-grade material from Queensway—approximately 700 tons daily grading between 9 and 10 grams per ton—trucked 270 kilometers to the Pine Cove facility.Queensway Phase 1 economics are compelling: 69,000 ounces annually at all-in sustaining costs around $1,300 per ounce translates to over $200 million in annual cash generation at current gold prices. The phased development approach addresses a critical constraint that would have faced a traditional large-scale build. As Bole noted, "The capex on a large plant that we had in the PEA was somewhere close to $900 million. Our market cap at the time was only $350-400 million." Raising nearly three times market capitalization would have required massive shareholder dilution and delayed first production until at least 2031.The two-asset strategy provides additional advantages beyond timeline acceleration. Operational experience gained ramping up Hammerdown's 700-ton-per-day open pit operation transfers directly to Queensway's identical-scale mining operation, significantly de-risking execution. Current production at Hammerdown also strengthens the company's position in project financing discussions, with lenders viewing existing cash flow favorably when evaluating facility terms for the Pine Cove expansion and Queensway development.View New Found Gold's company profile: https://www.cruxinvestor.com/companies/new-found-goldSign up for Crux Investor: https://cruxinvestor.com

Episode metadata supplied by the publisher feed · Published Feb 26, 2026

Embed this episode

NOW PLAYING

New Found Gold (TSXV:NFG) - Permitted Infrastructure Accelerates Path to Gold Production

0:00 12:58

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Company Interviews?

This episode is 12 minutes long.

When was this Company Interviews episode published?

This episode was published on February 26, 2026.

Can I download this Company Interviews episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!