New Mississippi River Bridge Project Moves Closer to Final Route Selection episode artwork

EPISODE · Jul 8, 2026 · 13 MIN

New Mississippi River Bridge Project Moves Closer to Final Route Selection

from Mornings with Brian Haldane · host Guaranty Broadcasting Company

DOTD Secretary Glenn Ledet provided an update on the new Mississippi River Bridge project, saying officials expect to select a preferred route by the end of the year after completing environmental reviews. He discussed the project's funding options, public input process, and estimated timeline, with construction planning to follow and a possible bridge opening in 2032 or 2033.

Episode metadata supplied by the publisher feed · Published Jul 8, 2026

Embed this episode

NOW PLAYING

New Mississippi River Bridge Project Moves Closer to Final Route Selection

0:00 13:14

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Mornings with Brian Haldane?

This episode is 13 minutes long.

When was this Mornings with Brian Haldane episode published?

This episode was published on July 8, 2026.

Can I download this Mornings with Brian Haldane episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!