New report on Site C casts doubt on project's financial viability
from Redeye Hosted by Redeye
A new report on the current and future viability of the Site C dam on the Peace River was released this month in the midst of BC’s recent election campaign. Energy economist Robert McCullough concluded that the project is a net loss and will cost British Columbians well into the future. Ken Boon is president of the Peace Valley Landowners Association. We spoke with him about the McCullough report.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of Redeye?
This episode is 17 minutes long.
When was this Redeye episode published?
This episode was published on October 31, 2020.
Can I download this Redeye episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.