New York's costly (and behind schedule) green future episode artwork

EPISODE · Feb 9, 2024 · 27 MIN

New York's costly (and behind schedule) green future

from Dispatches from Planet Albany

Politico New York's energy and environment reporter at the Capitol, Marie French, schools us on the state's effort to realize its renewable energy goals for 2030, the potential backlash to a proposed overhaul of transmission siting, and Gov. Kathy Hochul's opportunity to shape a key utility regulator. Then we'll talk about a recent Siena College Research Institute poll with Joe Reubens, who leads the qualitative and quantitative research department at The Parkside Group.      

Episode metadata supplied by the publisher feed · Published Feb 9, 2024

Embed this episode

Ready to play

New York's costly (and behind schedule) green future

0:00 27:34

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Dispatches from Planet Albany?

This episode is 27 minutes long.

When was this Dispatches from Planet Albany episode published?

This episode was published on February 9, 2024.

Can I download this Dispatches from Planet Albany episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!