Skip to content
Newtown Sewer Authority Q&A Regarding Rate Hike & Treatment Plant Plans episode artwork

EPISODE · Oct 16, 2024 · 26 MIN

Newtown Sewer Authority Q&A Regarding Rate Hike & Treatment Plant Plans

from Mack's Newtown Voice · host Mack's Newtown Voice

This a recording of the Q&A session at the 16 October 2024 meeting of the Newtown Water & Sewer Authority public meeting. At issue was the 43% rate increase starting in 2026 (read "#NewtownPA Sewer Authority Rates to Increase 43%!"; https://sco.lt/8o4g9A) and the proposed sewage treatment plant down Lower Silver Lake Rd from the Wawa site on the Newtown Bypass (read "#NewtownPA Sewer Authority Purchases Land for Sewage Treatment Plant"; https://sco.lt/6VZozw).

Episode metadata supplied by the publisher feed · Published Oct 16, 2024

Embed this episode

Ready to play

Newtown Sewer Authority Q&A Regarding Rate Hike & Treatment Plant Plans

0:00 26:53

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Mack's Newtown Voice?

This episode is 26 minutes long.

When was this Mack's Newtown Voice episode published?

This episode was published on October 16, 2024.

Can I download this Mack's Newtown Voice episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!