EPISODE · Oct 16, 2024 · 26 MIN
Newtown Sewer Authority Q&A Regarding Rate Hike & Treatment Plant Plans
from Mack's Newtown Voice · host Mack's Newtown Voice
This a recording of the Q&A session at the 16 October 2024 meeting of the Newtown Water & Sewer Authority public meeting. At issue was the 43% rate increase starting in 2026 (read "#NewtownPA Sewer Authority Rates to Increase 43%!"; https://sco.lt/8o4g9A) and the proposed sewage treatment plant down Lower Silver Lake Rd from the Wawa site on the Newtown Bypass (read "#NewtownPA Sewer Authority Purchases Land for Sewage Treatment Plant"; https://sco.lt/6VZozw).
What this episode covers
This a recording of the Q&A session at the 16 October 2024 meeting of the Newtown Water & Sewer Authority public meeting. At issue was the 43% rate increase starting in 2026 (read "#NewtownPA Sewer Authority Rates to Increase 43%!"; https://sco.lt/8o4g9A) and the proposed sewage treatment plant down Lower Silver Lake Rd from the Wawa site on the Newtown Bypass (read "#NewtownPA Sewer Authority Purchases Land for Sewage Treatment Plant"; https://sco.lt/6VZozw).
NOW PLAYING
Newtown Sewer Authority Q&A Regarding Rate Hike & Treatment Plant Plans
No transcript for this episode yet
Similar Episodes
Jul 22, 2025 ·55m
Jul 15, 2025 ·47m
Jul 8, 2025 ·61m
Jun 17, 2025 ·43m