Skip to content
Nitin Bhandari: Visual Construction Scheduling at Planera episode artwork

Nov 5, 2024 24 min

Nitin Bhandari: Visual Construction Scheduling at Planera

from Constructed Futures, An AI Edge Podcast Hosted by Nitin Bhandari

Follow Nitin here Check out Planera here: https://www.planera.io/

Episode details come from the podcast's RSS feed.

Embed this episode

As one of the key functions of a construction project team, scheduling has often been constrained by the need to have schedulers who were trained on complicated scheduling software. Planera was created to allow teams to collaborative participate in the scheduling process, unlocking expertise and efficiency in a highly visual, intuitive way. CEO Nitin Bhandari explains the product and how it's helping teams do better.

Ready to play

Nitin Bhandari: Visual Construction Scheduling at Planera

0:00 24:11

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Constructed Futures, An AI Edge Podcast?

This episode is 24 minutes long.

When was this Constructed Futures, An AI Edge Podcast episode published?

This episode was published on November 5, 2024.

Can I download this Constructed Futures, An AI Edge Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.