No transition without transmission? The grid equipment bottleneck explained episode artwork

EPISODE · Feb 11, 2025 · 28 MIN

No transition without transmission? The grid equipment bottleneck explained

from Energy Evolution

On this week's episode of Energy Evolution, we lay out why grid equipment has become a bottleneck in the deployment of renewables, and why it takes time to ramp up manufacturing.  Andreas Schierenbeck, CEO of equipment provider Hitachi Energy, shares industry perspectives on investment trends and the operational realities of scaling up industrial manufacturing of transformers, while S&P Global Commodity Insights analyst Cormac Gilligan explains why demand for grid infrastructure has outpaced supply.  Energy Evolution has merged with Platts Future Energy, and episodes are now published on Tuesdays. Links: Register for CERAWeek

Episode metadata supplied by the publisher feed · Published Feb 11, 2025

Embed this episode

NOW PLAYING

No transition without transmission? The grid equipment bottleneck explained

0:00 28:02

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Energy Evolution?

This episode is 28 minutes long.

When was this Energy Evolution episode published?

This episode was published on February 11, 2025.

Can I download this Energy Evolution episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!