Skip to content
Nuclear Power Plant Decommissioning episode artwork

EPISODE · Dec 6, 2024 · 14 MIN

Nuclear Power Plant Decommissioning

from Energy Risk Engineering · host John Munno - Risk Engineer, Golfer, Cancer Survivor.

Nuclear power plant decommissioning in the U.S. is a complex process overseen by the Nuclear Regulatory Commission (NRC). The process involves safely removing radioactive materials, dismantling structures, and ensuring the site is environmentally sound before license termination. Two main decommissioning options exist, SAFSTOR (safe storage) and DECON (immediate decontamination), with funding requirements determined by the NRC based on technical studies and cost estimations. Multiple agencies participate in the regulatory oversight to protect public health and safety. Numerous reactors have completed or are currently undergoing this process.

Episode metadata supplied by the publisher feed · Published Dec 6, 2024

Embed this episode

Ready to play

Nuclear Power Plant Decommissioning

0:00 14:47

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Energy Risk Engineering?

This episode is 14 minutes long.

When was this Energy Risk Engineering episode published?

This episode was published on December 6, 2024.

Can I download this Energy Risk Engineering episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!